Active Project
Main Canal Concrete Lining — Phase IV
Concrete lining of 3.6 miles of earthen main canal to eliminate seepage losses and stabilize delivery capacity to downstream laterals.

Project Overview
Phase IV continues the District's long-term program of replacing earthen canal sections with slip-formed concrete lining. Seepage testing along this reach measured losses of more than 15 percent of flow between the upstream and downstream measurement points during the summer irrigation season.
The lined section restores design capacity, allows higher flow velocities without bank erosion, and reduces the vegetation control and dredging required each year. Work is sequenced during the winter low-demand period so that deliveries to accounts served by the reach are not interrupted during peak season.
New measurement structures and staff gauges are installed at each lateral turnout along the reach, improving the accuracy of the water accounting reported to the Rio Grande Watermaster.
Timeline
October 2025
Board awarded construction contract
January 2026
Canal dewatered; earthwork and subgrade preparation began
April 2026
Mile 4.2 to Mile 5.9 lining complete and returned to service
December 2026
Anticipated substantial completion